Field Service Glossary: Jobs, Maintenance and Trade Terms Explained
18 Nov, 2026
A job card, a work order and a job sheet can mean much the same thing in one business and three different things in another. Add maintenance acronyms, contract terms and trade paperwork, and there is plenty of room for crossed wires.
This glossary explains the terms used by field service and trade businesses across the UK and Ireland, with examples from the work your team handles every day. Use it to check an unfamiliar abbreviation, clarify a process or agree what a term means in your business.
Compliance and tax entries explain terminology, not every obligation that might apply to a job. Requirements differ between Great Britain, Northern Ireland and the Republic of Ireland. Check the relevant regulator's current guidance for the work and location.
Jobs and Scheduling
Attendee
An attendee is someone assigned to attend a job. A visit might have one engineer or a team with different responsibilities. Recording each attendee separately helps the office see who is expected, what they need to do and whose time should be costed to the work.
Example: Two engineers attend an installation, with one responsible for the installation record and the other for recording their own labour.
A callback is a return visit prompted by a problem with earlier work or an unresolved fault. It is not the same as a planned second visit. Record the reason rather than assuming every callback is poor workmanship: parts failure, incomplete diagnosis and a separate fault can need different responses.
Example: An engineer returns because the original fault has reappeared after a repair.
Dispatch is sending an assigned job to the engineer who will carry it out, together with the information they need. That might include the address, site contact, access arrangements, asset history and required forms. Scheduling decides who goes and when; dispatch passes the instructions on.
Example: The office sends a repair to an engineer's field app, including the fault description and site access window.
First-time fix rate is the percentage of eligible repair jobs resolved on the first visit without a further visit for the same problem. To compare results fairly, agree which jobs count and how long you monitor for a return visit.
Calculation: Repairs resolved on the first visit ÷ eligible repair jobs × 100.
Example: If 80 of 100 eligible repairs are resolved on the first visit, the first-time fix rate is 80%. These are illustrative figures, not an industry benchmark.
A job card is the record that brings together the instructions and details for a particular job. It usually holds the customer, site, work required, assigned engineer, time, materials and outcome. A digital job card can also hold photographs, forms and signatures.
Example: An engineer opens a boiler service job card, checks the previous visit's notes, then records the work and any follow-up needed.
A job sheet records the work carried out during a visit, including the time spent, materials used, findings and outcome. Many businesses use “job sheet” and “job card” interchangeably. What matters is that the record gives the next person enough detail to understand what happened.
Example: The office uses a completed job sheet to check the labour and parts before raising an invoice.
An out-of-hours callout is a visit outside the business's normal service hours, often for an urgent fault. Attendance arrangements, charges and any contracted response times should be clear before the engineer is sent.
Example: A refrigeration engineer attends a failed cold room in the evening under a customer's emergency cover agreement.
In some job management systems, the primary user is the main person assigned to a job. The label can help distinguish a lead engineer from other attendees, but its exact meaning depends on the software and the way the business uses it.
Example: An installation has two attendees, with one recorded as the main contact for progress updates.
Route density describes how closely grouped a team's jobs are within a geographical area. A day of visits on neighbouring streets has higher route density than a day of jobs spread across several counties. Job duration, skills and access windows still need to fit the plan.
Example: A maintenance company books routine visits by area instead of sending engineers back to the same town on different days.
Route optimisation is planning the order and allocation of visits around travel and job constraints. The shortest route is not always the right one: appointment times, engineer skills, vehicle capacity and urgent work can all affect the sequence.
Example: A morning route is arranged around a site's restricted access hours, with nearby jobs booked before and after it.
Scheduling is deciding which engineer will attend each job and when. A workable schedule allows for skills, travel, job duration, parts, availability and site access, rather than filling every apparent gap in the diary.
Example: A repair is booked only after the office confirms that the engineer has the required part and the customer can provide access.
A sub-status adds detail to a job's main status. “Incomplete” tells the office that work remains; “awaiting parts” explains why. Useful sub-statuses make the next action clear without someone having to open every record.
Example: A repair remains incomplete with a sub-status of “awaiting customer approval”.
A timesheet records the hours someone has worked, often split between jobs, travel and other activities. It supports payroll and labour costing. Hours worked, hours chargeable to a customer and hours invoiced are different measures.
Example: An engineer records time on two repairs, travel between sites and an internal training session separately.
A work area is a geographical zone used to organise service coverage and allocate jobs. It might follow postcodes, counties or a business's own boundaries. Some businesses call it a service area or territory.
Example: The office normally assigns Belfast jobs to engineers covering that area, checking skills and availability before booking.
A work card is another name for a job card or work record. The wording varies between businesses; it usually describes the document holding the job instructions and the details of work completed.
Example: A maintenance team records a pump repair, parts fitted and test results on a work card.
A work order is an instruction or authorisation to carry out a defined piece of work. It normally identifies the site, task, priority and person responsible. Some businesses keep it separate from the completion record; others use one record throughout the job.
Example: A facilities manager raises a work order for a faulty door closer, which the contractor updates after attending.
Workforce management is planning and managing people's availability, working hours and assignments. In field service, it includes matching engineer capacity and skills to the work booked. Field service management also covers the jobs, assets and customer records around that work.
Example: A service manager reviews annual leave and on-call cover before accepting more maintenance visits.
An asset is an identifiable piece of equipment that a business maintains, services or tracks. For a field service contractor, this often means customer equipment such as a boiler, pump or alarm panel. Each asset needs its own identity so records do not get attached to the wrong unit.
Example: Two identical air conditioning units at one site have separate asset references, serial numbers and service histories.
In field service, asset management means keeping track of the equipment you maintain, its condition, its history and the work it needs next. It connects the physical item at the customer's site to the records your team uses to look after it.
Example: Before quoting a replacement pump, the office checks its repair history, age and outstanding findings.
An asset register is a structured list of equipment, including identifying details and locations. It can also link to service histories, documents and maintenance schedules. “Boiler in plant room” may not be enough when the site has three of them.
Example: An engineer checks the serial number against the register before recording a service.
CAFM is software used to organise the operation and maintenance of buildings or estates. Depending on the system, it can cover assets, work orders, contractors, maintenance, space and compliance records. Its focus is usually the facilities being managed rather than only the contractor's workforce.
Example: A facilities manager uses CAFM to coordinate maintenance across several buildings and review the records returned by contractors.
An inspection checks equipment's condition or safety; servicing carries out maintenance to keep it working. A visit can include both, but one does not automatically satisfy the other. A legally required examination may also be a separate activity with its own competence and reporting requirements.
Example: A lift has routine servicing and a separate thorough examination. Completing the service does not close the examination requirement.
Mean time to repair is the average time spent repairing equipment across a defined set of failures. Calculate it by dividing total repair time by the number of repairs. Agree what starts and stops the clock: active repair time is different from the full elapsed time between a fault being reported and service being restored.
MTTR is also used to mean “mean time to restore” or “mean time to resolve”. Label the measure clearly before comparing reports.
Example: A contractor reports hands-on repair time separately from the days spent waiting for a replacement part.
Multi-site describes work managed across several locations, often for one customer or under one contract. Each location needs distinct job and asset records, even when billing and reporting roll up to a single account.
Example: A retailer has one customer account but separate service histories for each branch.
Planned preventive maintenance is maintenance scheduled in advance to reduce the likelihood of equipment failure. It can be based on time or usage, such as a quarterly visit or a service after a specified number of running hours. “Preventative maintenance” is another common spelling.
Example: A maintenance contract includes scheduled filter changes rather than waiting for restricted airflow to cause a fault.
A QR code used for asset tagging links a physical piece of equipment to information about it. Where the system supports it, scanning the tag opens the relevant asset record. The tag still needs to match the equipment and remain readable.
Example: An engineer scans a pump's label and checks its identity before opening the previous service record.
Reactive maintenance is work carried out in response to a fault or failure. It is triggered by the problem rather than a preventive schedule, although not every reactive job needs immediate attendance.
Example: A customer reports a failed extractor fan, and the office assesses the priority before booking a repair.
Reactive work responds to an issue; planned work is arranged in advance. Planned work can include preventive servicing, inspections or a repair deliberately booked for a later date. The distinction is about how the work is organised, not simply whether something is broken.
Example: A failed component needs a reactive assessment, but its replacement is planned for the customer's next shutdown.
Service frequency is how often equipment is due for maintenance. The interval should reflect the relevant requirements, manufacturer instructions, operating conditions and agreed maintenance plan. A late visit does not necessarily mean the next due date should move back by the same amount.
Example: An asset follows fixed quarterly service dates, with overdue visits flagged rather than quietly resetting the whole schedule.
A service kit is a group of parts and consumables prepared for a particular maintenance task. In software, a stock bundle may let the team select those items together. The contents still need checking against the actual equipment and work required.
Example: The stores team prepares the correct filters, seals and consumables for an upcoming service.
A service level agreement sets out agreed standards for the service a customer will receive. These can include response, attendance and resolution targets, along with priorities, service hours and reporting arrangements. A four-hour response does not automatically mean a four-hour repair.
Example: A contract specifies an attendance target for critical faults and a separate process for agreeing repairs that need specialist parts.
“Compliance certificate” is a broad label for documentation relating to a particular standard or requirement. It is not one universal document. Use the actual document name in your records, and distinguish certificates from inspection reports, test results and service sheets.
Example: The office files an electrical certificate under its proper name and reference rather than calling every attachment a compliance certificate.
A consignment note records a waste movement under the applicable waste rules. In England and Wales, the term is commonly associated with hazardous waste. Requirements and document names differ elsewhere, so one country's form should not be assumed suitable for another.
Example: Before hazardous waste leaves a site, the responsible team checks the required movement documentation for that location and waste type.
In Irish domestic gas work, a Declaration of Conformance is certification issued by a Registered Gas Installer for the work covered by the declaration. Keep it with the relevant installation and job records. It should not be confused with a routine service sheet or a general guarantee about all equipment at the property.
Example: Following a boiler installation in the Republic of Ireland, the customer retains the applicable declaration with the installation paperwork.
Digital waste tracking is the electronic recording of information about waste movements and handling. The UK government's Digital Waste Tracking service is being introduced in phases for different operators and nations. It is not simply another name for scanning a paper transfer note.
Example: A waste receiving site records the information required for its phase of the service, following the relevant regulator's instructions.
Electrical certification records the inspection, testing and declarations required for particular electrical work. The correct document depends on the work and jurisdiction. UK certificate names should not be treated as interchangeable with the certification arrangements used in the Republic of Ireland.
Example: Before setting up a digital form, an electrical contractor confirms the correct certificate, required information and authorised signatories for that work.
An Electrical Installation Certificate records the design, construction, inspection and testing of electrical installation work covered by the certificate. In the UK BS 7671 context, it is used for work such as a new installation or a new circuit. It is different from a condition report on an existing installation.
Example: An electrician records a newly installed circuit on an EIC with the relevant inspection and test schedules.
An Electrical Installation Condition Report records the results of inspecting and testing an existing electrical installation. It describes the condition found, including observations and limitations. It is not a certificate for new installation work, and there is no single inspection interval that applies to every property and jurisdiction.
Example: A property manager reviews an EICR's observations and arranges any necessary follow-up work separately.
F-gases are fluorinated greenhouse gases, some of which are used as refrigerants. “F-gas rules” refers to the requirements governing activities involving those gases, including relevant certification, leak checking and record-keeping. The applicable regime depends on the location, equipment, gas and activity.
Example: A refrigeration business checks which refrigerant and equipment records are required for a particular customer's system.
Gas Safe Register is the official gas registration scheme used in Great Britain and Northern Ireland. When booking gas work, check both the registration and the categories of work the engineer is qualified to carry out. Registration is not permission to undertake every type of gas work.
Example: Before assigning a commercial gas job, the office checks that the engineer's registered work categories cover it.
A gas safety record documents the results of a gas safety check. It records the relevant checks and findings; it should not be treated as a promise that no defects exist. A routine service and a landlord's gas safety check are different activities, even if arranged for the same visit.
Example: An engineer completes the safety check record, notes any defects and records follow-up action separately.
Lone working means working without close or direct supervision. The risks depend on the task, site and circumstances, not simply whether the engineer is alone in a building. Check-in procedures need a clear response when someone misses a check-in.
Example: An engineer attending an isolated site follows an agreed contact procedure, with a named person responsible for responding to missed contact.
A Minor Electrical Installation Works Certificate documents qualifying additions or alterations to an existing circuit in the UK BS 7671 context. It is not the form for installing a new circuit. Do not assume the same certificate applies to electrical work in the Republic of Ireland.
Example: An electrician checks whether a small alteration to an existing circuit falls within the scope of the minor works certificate.
Portable appliance testing, usually called PAT testing, describes the examination of electrical equipment through inspection and, where appropriate, testing. The checks and frequency depend on the equipment and its use. HSE's Great Britain guidance makes clear that there is no blanket legal requirement for annual PAT testing of every appliance.
Example: A business bases its equipment maintenance programme on risk rather than automatically giving every item the same annual test date.
RAMS refers to risk assessments and method statements used to plan work safely. The risk assessment identifies hazards and control measures; the method statement explains how the work will be carried out. The documents need to reflect the actual task and site, not just the last similar job.
Example: Before a roof-level maintenance visit, the team reviews the access arrangements and task-specific controls.
A Registered Gas Installer is a gas installer registered under the relevant scheme in the Republic of Ireland. For domestic gas work, check the installer's current registration and the certification required for the task. RGI and Gas Safe are separate registration arrangements.
Example: A homeowner checks an installer's registration before booking domestic gas installation work in the Republic of Ireland.
A statutory examination is an examination required under the law applying to particular equipment or activities. It may need a competent person, a specified report and an examination schedule. Routine maintenance does not automatically meet that obligation.
Example: Lifting equipment receives a thorough examination under the applicable requirements, separately from its routine maintenance visits.
Waste duty of care describes responsibilities for managing waste safely and transferring it appropriately. In practice, this includes checking who handles the waste and keeping the required records. The rules and terminology vary across the UK and the Republic of Ireland.
Example: A contractor checks the carrier's authorisation and retains the required handover records rather than relying only on an invoice for collection.
A waste transfer note records a transfer of non-hazardous waste under the applicable duty-of-care arrangements. It identifies the waste and the parties involved. Hazardous waste can require different documentation, and UK terminology should not be assumed to apply unchanged in the Republic of Ireland.
Example: A business retains the relevant transfer record when a registered carrier collects its non-hazardous waste.
Cash flow is the movement of money into and out of a business. It is different from profit: a profitable job does not put money in the bank until the customer pays, while wages and supplier bills may fall due earlier.
Example: A contractor has completed a profitable installation but still needs to fund payroll while waiting for payment.
A contract is an agreement setting out the work or services to be provided and the terms that apply. In field service, it might cover maintenance visits, reactive cover, prices and service standards. Linking the associated jobs helps the business review delivery and costs across the agreement.
Example: A maintenance contract covers quarterly visits to specified assets, with additional repairs priced separately.
Cross-border working means carrying out work in more than one jurisdiction. For businesses operating across Northern Ireland and the Republic of Ireland, this can involve different tax, registration and technical requirements. The correct treatment depends on the work and the parties involved, not just the currency on the invoice.
Example: Before accepting a job across the border, a contractor asks their adviser to confirm the tax treatment and checks the relevant trade requirements.
An invoice is a document requesting payment for goods or services supplied. It sets out the charges, relevant tax information and payment terms. Depending on the agreement, an invoice may cover a deposit, a stage payment, a completed job or a billing period.
Example: The office raises a repair invoice using the approved labour, parts and customer purchase order reference.
Job costing is recording and adding up the costs attributable to a particular job. These can include labour, materials, travel, subcontractors and an agreed allocation of overheads. Comparing those costs with revenue shows how the job performed against its price or estimate.
Example: A repair's parts were costed correctly, but extra travel and an unplanned return visit reduced its margin.
A lead source is the channel or activity that brought an enquiry to the business. Keeping a consistent record helps the team compare enquiries with work actually won, rather than judging marketing only by the number of calls or form submissions.
Example: The office records whether an enquiry came through a search advert, the website or an existing customer recommendation.
Margin is the difference between revenue and the costs included in the calculation, expressed as a percentage of revenue. Be clear whether a report shows gross margin, contribution or net margin: they do not include the same costs.
Calculation: (Revenue − included costs) ÷ revenue × 100.
Example: A job with £1,000 revenue and £700 in included costs has a 30% margin on that basis. This is an illustrative calculation, excluding VAT.
Markup is the amount added to cost to arrive at a selling price, usually expressed as a percentage of cost. Margin is measured against the selling price, so the two percentages are not interchangeable.
Example: A part costing £100 sold for £130 has a 30% markup and approximately a 23.1% margin, before other costs. These illustrative figures exclude VAT.
A nominal code identifies an account in the accounting system's chart of accounts. It helps classify transactions, such as sales of labour or materials. When systems are connected, the mapping needs to send each transaction to the intended account.
Example: Labour and parts sales are assigned different nominal codes so the accounts team can report them separately.
A purchase order is a buyer's document ordering specified goods or services from a supplier. Your business might issue a PO for parts or receive one from a commercial customer authorising work. Those are different sides of the same purchasing process.
Example: The customer's PO number is recorded against the job and included on the invoice, while a separate supplier PO covers the replacement part.
A quote is a priced proposal setting out the work offered and the terms on which it will be supplied. Clear scope, exclusions and approval arrangements help distinguish the agreed job from additional work identified later.
Example: A quote covers replacing a pump but excludes unrelated repairs discovered during the visit.
Quote-to-cash is the process from preparing a quote through delivering the work, invoicing and receiving payment. Looking at the whole process helps distinguish delays in approval, delivery, billing and collection.
Example: A business finds that jobs finish on time but invoices wait for missing purchase order references.
A recurring invoice is an invoice created on a repeating billing schedule. It can suit a maintenance agreement with regular charges. The billing schedule and service schedule need not be identical, so one should not be treated as proof that the other has happened.
Example: A customer is billed monthly under an agreement that provides quarterly maintenance visits.
Relevant Contracts Tax is an Irish withholding tax applying to certain payments from principal contractors to subcontractors in construction, forestry and meat processing. Revenue's published deduction rates are 0%, 20% and 35%. RCT does not apply to every service job simply because it takes place in Ireland.
Example: Before paying for work within RCT, a principal contractor follows Revenue's notification process and applies the authorised deduction rate.
A requisition is an internal request for goods, materials or a purchase. It tells the relevant person what is needed and why; it is not the same as an order sent to a supplier.
Example: An engineer requests a replacement component, and the office checks availability and approval before raising a purchase order.
Reverse charge VAT is a mechanism under which the customer accounts for VAT rather than the supplier charging it in the usual way. Construction reverse-charge arrangements in the UK and the Republic of Ireland have their own conditions. Do not assume that every business-to-business repair qualifies.
Example: Before issuing a construction invoice, the accounts team confirms whether the reverse charge applies to that transaction.
A schedule of rates is an agreed list of prices or pricing rules for defined work. It can cover labour, materials, standard tasks or callout charges. The descriptions and conditions matter as much as the figures.
Example: A maintenance contract sets agreed rates for specified repairs, with separate terms for work outside normal hours.
VAT is a tax on taxable supplies of goods and services. The applicable treatment depends on factors such as the supply, location, parties and registration position. Working in both the UK and the Republic of Ireland means checking the rules for each transaction rather than copying one standard invoice setup.
Example: The accounts team confirms the VAT treatment before billing a job across the border.
Accounts integration connects operational software with an accounting package so agreed information can pass between them. What moves, in which direction and how often depends on the connection. Invoice synchronisation does not necessarily include payments, credit notes or every customer field.
Example: An approved invoice transfers to the accounting system, while the team checks and resolves any synchronisation errors.
An API is a defined way for software to request information or actions from another system. It can support a custom connection where there is no suitable ready-made integration. Access, permissions and the functions available depend on the API.
Example: A developer uses an API to pass approved job information to another business system.
An audit trail is a record of relevant events or changes, showing what happened, when and, where recorded, who was responsible. In field service, it can help trace job updates, approvals and document changes. Its usefulness depends on the detail captured and how the record is protected.
Example: The office checks when a job was submitted, who reviewed it and when it was approved for invoicing.
CRM means managing information about customers, prospects and the business's interactions with them. CRM software holds records such as contacts, enquiries and communication history. In a field service business, customer accounts also need a clear relationship with sites, jobs and billing contacts.
Example: The office distinguishes the person booking a visit from the person who approves charges and the person who receives the invoice.
A customer portal is a controlled online space where customers can access information made available to them. Depending on the system and permissions, that might include job progress, reports, certificates or invoices. Not every internal note belongs in the customer-facing view.
Example: A property manager signs in to retrieve the service reports shared for their sites.
A dashboard brings selected figures and reports together on one screen. It should make the scope clear: which team, dates, job types and statuses are included. A figure is only useful if the person reading it understands what it counts.
Example: An operations dashboard separates overdue planned visits from unassigned reactive work.
A display layout is the arrangement of fields and sections on a software screen. Where it is configurable, a business can organise the information people see when creating or updating records. Layout changes and changes to the underlying information are not the same thing.
Example: Site access details are placed beside the job address so the scheduler can find them while booking.
Field service management is the organisation of work carried out at customer sites. It connects booking, preparation, engineer assignment, on-site records, follow-up and billing. It describes the process; field service management software is one way to support it.
Example: The office confirms a repair, assigns an engineer, passes on the site history and uses the completed work record to prepare the invoice.
Field service management software helps a business coordinate site-based work and the information around it. Common functions include scheduling, mobile job records, forms, assets and invoicing, although the scope varies between products. Check the actual workflow rather than assuming the category name guarantees a feature.
Example: A service team carries the customer's details from booking through to the job record and invoice without typing them into three separate systems.
An integration connects systems so they can exchange information or trigger agreed actions. It might be a standard connector or a custom-built connection. Successful data transfer still depends on permissions, matching records and handling exceptions.
Example: A job system sends approved invoice information to an accounts package and flags records that could not be transferred.
Job management software helps organise work from enquiry or quote through scheduling, completion and billing. It overlaps with field service management software, particularly where engineers work at customer sites. The practical difference depends on what each product supports.
Example: A contractor records an accepted quote, books the work and prepares the invoice from the completed job.
A key performance indicator is a measure chosen to show progress towards a particular goal. Field service examples include first-time fix rate, overdue maintenance and the time between job completion and invoicing. A useful KPI has a clear definition, owner and reporting period.
Example: To investigate late billing, the office tracks completion-to-invoice time separately for jobs billed individually and jobs billed under contracts.
A field app is the software engineers use on a phone or tablet to access and record job information. Depending on its features, it can support forms, photographs, parts, time and signatures. What an engineer can use without a connection needs checking separately.
Example: An engineer reviews the visit instructions and records the parts used while on site.
Offline working is the ability to carry out supported tasks without an internet connection, with information synchronising later. Available jobs, forms and attachments may depend on what was downloaded beforehand. An update saved on the device is not necessarily an update the office has received.
Example: An engineer records work in a basement plant room, then checks that the submission has synchronised once connected. Urgent findings follow the agreed direct escalation procedure.
A preset filter is a saved set of conditions used to show a particular group of records. It helps people return to the same working view without rebuilding the filters each time. The result still depends on the selected dates, permissions and other conditions.
Example: A dispatcher opens a saved view of today's unassigned reactive jobs.
Reporting turns recorded information into tables, summaries or charts. In field service, it can show job progress, maintenance delivery, costs and billing. The report needs to distinguish missing information from a genuine zero.
Example: A contract review shows planned visits due, visits completed and work still outstanding, with the reporting dates stated.
Stock management is tracking the parts and materials a business holds, uses and orders. It covers quantities, locations, movements and costs, whether the items are in stores, on a van or allocated to a job.
Example: A part used on a repair is recorded against that job and deducted from the correct stock location.
Van stock is the parts and materials carried in an engineer's vehicle. A useful record shows what is actually available, not just what was loaded last month. Replenishment decisions can then reflect usage and the work coming up.
Example: Before a planned service, the engineer checks that the required seals are on the van rather than relying on an old stock list.
A workflow is the sequence of steps, decisions and handovers used to move work forward. It can include approvals, required information and different routes for different outcomes. Automation may support it, but the process still needs to say who deals with exceptions.
Example: A completed job goes to review. If the materials record is missing, it returns to the engineer; if approved, it moves to invoicing.